Oil/Sand Separation Plant

We designed and built a prefabricated process system capable of upgrading various hydrocarbons. This project incorporated a diverse range of mining and process equipment including pumps, heat exchangers, double wall tanks and chillers. Our skilled team also collaborated with RK Electrical to install and integrate the electrical components of the system to ensure smooth operation.

We designed, constructed and tested two double-wall tanks in compliance with UL-142 standards, suitable for large volumes of up to 5000 gallons. To accommodate these tanks and the associated hydrocarbon liquid, we also designed structural frames. We ensured process requirements were met by running extensive electrical cabling and instrument wiring along the tanks’ exterior.