Merck Pharmaceuticals

Industries : Biopharmaceutical, Industrial
Solutions : Mechanical
Regions : Metro Colorado

The Merck facility underwent modifications for Level III clinical trials. RK Mechanical installed clean utility systems piping, bio processing equipment (BPE) and cGMP systems, UG and AG plumbing and HVAC duct work which included stainless steel, transfer panel modifications, passivation, quality control inspections and TOPs.