South Metro Transfer Station Rebuild Groundwater Management

Industry
Government
Solution
Specialty Contracting Services

RK Water provided deep well dewatering, groundwater treatment, and operational support for the South Metro Transfer Station rebuild in Englewood, Colorado. Dewatering was required during construction of a new 70,000-square-foot waste transfer facility with underground loading tunnels.

The project required continuous groundwater dewatering to support deep excavations, waterproofing and concrete placement while maintaining dry and stable site conditions. RK Water delivered an integrated solution combining dewatering, groundwater treatment, operated labor, sampling and compliance management under a single scope.

By coordinating groundwater control, treatment and field operations, RK Water supported critical below-grade construction activities, adapted to evolving site conditions and maintained groundwater levels below bottom of excavation.

Key Highlights

Deep Well Dewatering: Supported excavation for two underground loading tunnels.

Integrated Treatment and Sampling: Provided groundwater treatment and effluent sampling throughout active construction.

Full-Service Delivery: Combined dewatering, treatment, monitoring and operational labor into a streamlined solution.

Contact us today to learn how RK Water can support your next project with reliable groundwater treatment solutions