Four Seasons Mountain Village Dewatering Equipment and Groundwater Treatment System
Located in Telluride, Colorado, the Four Seasons Mountain Village development is a high-profile, luxury alpine project requiring extensive excavation and infrastructure installation in a constrained, high-elevation environment. To support construction under strict environmental requirements, RK Water partnered with Weitz Construction to deliver continuous groundwater control and treatment in a setting defined by variable flows, limited space and challenging site logistics.RK Water provided a complete dewatering and treatment system, including installation of 26 submersible pumps equipped with variable frequency drives (VFDs), along with a fully integrated treatment solution engineered to meet permit requirements. Designed for flows up to 400 GPM, the system incorporated multi-stage filtration to maintain consistent performance and compliance while supporting uninterrupted construction activities.Due to site constraints and limited existing infrastructure, RK Water also developed a solution to deliver 480V power to support system operations, ensuring reliable performance of all pumping and treatment equipment throughout the project.
Execution was carefully coordinated with ongoing site development, including phased construction and evolving excavation conditions, to ensure the system aligned with project sequencing and did not impact critical path work. The use of VFD-driven pumps allowed the system to adapt to changing groundwater conditions in real time, improving operational efficiency and reducing risk in a dynamic environment.
How we delivered:
System Design: Designed to handle variable groundwater conditions and flows up to 400 GPM.
Seamless Integration: Coordinated installation within a constrained, high-elevation construction site to align with logistics and avoid disruption to ongoing work.
Operational Flexibility: Utilized 26 submersible pumps with variable frequency drives (VFDs) to adjust in real time to changing site conditions.
480V Power Solution: Developed a temporary 480V power distribution solution to support continuous operation of pumping and treatment systems in a limited infrastructure environment.
Regulatory Compliance: Designed to meet strict stormwater and total suspended solids (TSS) requirements, maintaining compliance throughout construction.
Collaborative Execution: Worked closely with Weitz Construction to align system deployment with project milestones and maintain uninterrupted progress.Contact us today to learn how RK Water can support your next project with reliable, performance-driven water solutions.